Phase 4Recruiting

Concurrent Versus Sequential Administration of Tdap and RSV Vaccines in Pregnancy (CosTaR)

Concurrent Versus Sequential Administration of Tdap and RSV Vaccines in Pregnancy - A Pilot Feasibility Trial

Sponsor
Canadian Immunization Research Network (Research network)
Enrollment
60 planned
Conditions
RSV; Tdap - Tetanus, Diphtheria and Acellular Pertussis Vaccination; Pregnancy; Healthy
Interventions
Tdap Vaccine Administration; RSV Vaccine; Saline (as a placebo)
Ages
adults
Registry
NCT07097012

Full record on ClinicalTrials.gov

From the registry

The goal of this clinical trial is to learn if the RSV vaccine (protects against respiratory syncytial virus) and Tdap vaccine (protects against pertussis) are most effective in pregnant individuals when taken together at the same visit, or separately at different visits. This clinical trial will also learn about the safety and immune responses of these vaccines in pregnancy. The Main question: -Is it possible to run a successful trial that tests how safe and effective it is to give Tdap and RSV vaccines in pregnancy either at the same time or one after the other, at different visits? The Secondary question: -To determine how safe and how well the Tdap and RSV vaccines work when given in pregnancy either at the same time or one after the other, at different visits. The Exploratory (optional participation) questions: * To measure the levels of antibodies against whooping cough (pertussis) and RSV in mothers at 7 and 19 months after giving birth, depending on whether they got the vaccines at the same time or one after the other during pregnancy. * To measure whooping cough…

Primary outcomes

  • Feasibility of conducting a randomized controlled trial - Screening Rate
  • Feasibility of conducting a randomized controlled trial - Consent & Randomization Rate
  • Feasibility of conducting a randomized controlled trial - Retention Rate
  • Feasibility of conducting a randomized controlled trial - Trial Protocol Compliance Rate

History

  1. Study completion expected

  2. Primary completion expected

  3. Last registry update

  4. Started

  5. Registered